How is the Contractor informed of Health and Safety issues at Tender stage?

A Contractor is usually informed of Health and Safety issues at Tender stage through the Designer’s Risk Assessment. This is prepared by the designer and can be issued as part of the tender package.

The Pre-Construction Information which is already prepared by the Client should also include all the essential information for the Contractor to take into account before providing his tender.

Related Posts